Street Work Maintenance – Monday, December 10, 2012

To All Residents:

On Monday, December 10th, the following areas are scheduled for paver or speed bump work:

GARABALDI GATE:  The vehicle entrance will be closed for paving construction.  Incoming and outgoing traffic will be diverted at the vehicle exit gate.

MANTA GATE:  The vehicle entrance will be closed for paving construction.  Incoming and outgoing traffic will be diverted at the vehicle exit gate.  Once the entrance is completed, the vehicle exit will be closed for paving construction.  Incoming and outgoing traffic will be diverted at the vehicle entrance gate.

SALVADOR BAY ENTRANCE:  A section of existing stamped concrete will be removed and refilled with asphalt.  Traffic will be allowed to flow thru at all times.

SELVA GATE: A speed bump on Windward will be removed and relocated.  Traffic will be allowed to flow thru at all time.